AETS, Gestion des Risques - Renforcement institutionnel - Développement durable

AETS en français AETS in english

Accueil > Projets > Technical assistance for preparing transmission system master plan of NEPAL ELECTRICITY AUTHORITY (NEA)...

>

Technical assistance for preparing transmission system master plan of NEPAL ELECTRICITY AUTHORITY (NEA)

Technical assistance for preparing transmission system master plan of NEPAL ELECTRICITY AUTHORITY (NEA)

Date : 2013-12-11 / 2015-10-30
Montant total du projet : 165912.00 €
Client : EDF
Financement : World Bank

Preparation of the Transmission System Master Plan (TSMP)in Nepal, in order to provide a transmission system development plan covering 2013 to 2030 that will optimize projected load flows within Nepal and between Nepal and India.